Multiple Buildings – 80 Acres
Water Line = 6”
Sewer Line = At property line, will be extended to building site
Natural Gas = High pressure line in US 31-can be extended
Electricity = 3 Phase
Cullman EC’s largest customer adjacent to site
CSX rail line extends through the eastern portion of the tract in a north/south direction
Zoning = No
Water/waste water provided by City of Hanceville
Existing facility is currently being razed.
ADEM VCP letter available